-Noise restriction area : (hospital/school/residential area/ park/road
intersecting downtown area): protection of residential environment
-Danger-stricken area :( sloping road/bridge/curved road/riverside
road/elevated road) : prevention of accidents on rainy roads -Highway :
Elimination of water splashing and hydroplaning/Prevention of diffused
reflection
ECOPHALT Pavement Plan
Calculation of thickness : Based on close
grade surface layer
1)OVERLAY after cutting
-Make holes at the side of rain water pipe and connect -Secure lower
waterproof layer (Asphalt/Concrete) at the drainage layer. -In case of
cutting sloping area : After giving sloping treatment ( above 30 degrees) and
cutting of crossing joint, make it lead to side holes (rain water pipe)
2)OVERLAY(no cutting) : Covering
-Lay down pavement at 5-10cm inside the road from the outer line of
impermeable road shoulders -Natural drainage using shoulders -Secure
lower waterproof layer(Asphalt/Concrete) of drainage layer.