Measures for
maintaining the functions of Special
Pavement(Drainage/Permeability) |
| It means colored asphalt compound pavement (called
penetration Hot Mixed Asphalt) with openings inside, which is used for such
roads as bicycle road in Plazas, sidewalks in parking lots. Rain water is
permeated through the pavement into underground.
|
|
advantage |
1.Elimination of Hydroplaning : safty of traffic
2.Reduction of traffic noise : supplementing noise insulation
wall/resolution of civil appeals ( 50%-80% decrease) 3.Increase in
durability and more comfortable driving 4.Recycling of junk tires |
|
considerations |
1.Clearing and maintenance of openings of pavement
2.Apply guideline for drainage treatment |
|
application |
Industrial Road, Highway, Residential area
(accident-stricken slippery area/ areas where civil appeal concerning noise is
filed from.)
| | |
- Regular clearing is required to maintain drainage
capability and penetration and prevent cloggings of openings(Having introduced
without clearing system of openings)
- A wide range of pavement has been neglected with its
openings not cleared and, as a result, lost its functions. Clearing of openings
is indispensable for water storage and protection of underground ecological
system.
|
|
Permeable pavement |
Seoul had introduced it as part of detering violent
demonstrations (stone-throwing) around universities since 1987. Afterwards, the
advantage of the pavement received attention. In 1999, it was applied to
pavement of Yoido Park and sidewalk repair projects, bicycle road constructions
and other projects. |
|
drainage pavement |
Advanced pavement taking into account comfortable driving
conditions(reduced noise) and safe driving on rainy road.( Since the Ministry of
Construction and Transportation selected the construction method, this method
has been used throughout the country.
| | |
|
Maintenance of function: Made vacuum clearing machines
|
|
Plan 1 |
Introduction of foreign-made vacuum clearing machines and
then sasphaltt localization of the machines |
|
Plan 2 |
Outsourcing to civilian cleaning service companies: After
conducting cost accounting, make contract with a certain unit price per a square
M (500 yen in Japan)
| | |
|
Issuance of guidelines for maintenance of the existing penetration pavement
and future drainage pavement (Maintenance of initial penetration)
Japanese provision : 1*10-2cm/sec(400cc permeated within 15 seconds)
Evaluate penetration after clearing
Quality Guarantee
Strict specifications should be applied to production, construction and
maintenance.
Issuance of instructions on drainage pavement zone
The method shall be applied to noise insulation zone, slipping prevention
pavement zone and dangerous zone stricken with accidents caused by slippery
rainy road.
Begin with building the pavement in the areas where civil appeals come from
on environmental problems and frequent traffic accidents.
|
|
Issuance of maintenance guidelines on clearing of openings : 1*10-2cm/sec
and above required to be maintained. |
|
Plan 1 |
Appropriate budget for equipment for functional maintenance
: (transfer the budget for the existing slipping prevention pavement to this
type of pavement |
|
Plan 2 |
Outsourcing to civilian companies : Make contract of unit
price after conducting cost accounting for the companies possessing equipment :
allocate the budget for maintenance cost ( transfer the budget for slipping
prevention pavement to this type of pavement) | | |
|
| |
|