|
|
|

|
When status of road surface is abnormal, it can easily
lead to the accident. Road Quick is the product to repair and recover the damage
of road immediately so as to enhance convenience of customers to use the road.
It also can be used in various places such as other industrial facilities etc.
as well as the road.
|
 |
- Used for both Asphalt and concrete (red color)
- Durable repair
- Road can be open up during construction (min
3minites)
- Very economical Technology is not required (used by everybody everywhere)
- Not influenced by season or surroundings (below 45C-60C)
- No shrinkage, excellent waster proof, adhesion and flexibility under extreme
weather.
- Easy to deliver and construct and suitable for refined
repair
- Special equipment and tools are not required
- Additional additive, clue and tar coating are not
required prior to construction
- Heating is not needed
- Sand is not required to be scattered after completion of
construction
- Easy delivery by small sized package and economical
without waste
- Long storage period
- Experiences for a long time and verification of test
data
|
 |
|
Urgent repair of road, holloe, sediment place, crack.
Repair work caused by breakage of electricity, water pipe, gas pipe or subway
construction. Urgent repair of damage in runway, Heliport, emergency road. Road
construction and repair in and around hospital, park, school, parking lot and
factory. Other industrial facility, rooftop of building, playground, tennis
court, overpass and underground road. Damage payment of port and yard.
Construction of bridge and concrete road and shrinking joint.
|
 |
 |
|
1. break the part to be repaired and remove water or impurities. 2.
spread boiled asphalt on the broken part to make adhesion easy (boiled
asphalt, tank, spray, personnel) 3. sustaining the temperature of asphalt
when it arrives at the site at 25C and fill it to the place to be repaired
(asphalt plant process, truck, personnel, shovel) 4. harden by shovel,
vibrating roller or compactor etc.(shovel, roller, personnel) 5. when parts
to be repaired is hardened after business hour, let the vehicle pass 6. there
is a plausibility of traffic accident or traffic jam 7. bad adhesion with
existing layer and inferior stability 8. repair is impossible in rain or
extreme weather in winter 9. time : it takes long time in comparison with
new material and construction method 10. economical : more expensive than new
material and construction method in terms of total
cost
| | |
 |
|
1. unnecessary (regardless of water) 2. unnecessary 3. storage at
relatively high temperature is permissible and easy for construction just pour
the new material into the place to be repaired and tramp or harden with
appropriate equipment. 4. unnecessary 5. Cars might pass through
immediately after the repair work. 6. not at all 7. permanent and
excellent adhesion with existing layer and outstanding stability 8. repair is
possible regardless of the season by everybody 9. time : about 1-2
minutes 10. economical : saves more than 33% in cost, compared with
conventional
method
| | |
|
|
| |
|