´Ù¸°Å×Å©¿¡ ¿À½Å°ÍÀ» ȯ¿µÇÕ´Ï´Ù!

            Ecophalt

            DAMA Asphalt

            DAMA

            Road Quick

            Tussphalt

            Combi phalt

 

 


 
Tusphalt is designed to diversify the municipal environment and create more artistic and environmentally-friendly city view. It reduces the cost of construction in comparison with color Tusconcrete or small high pressured block pavement and offers comfortable feeling in walking. On top of that, it is highly effective for an exclusive bicycle road compared to other method of construction.

1. Superior permeation 1×10­¹ ~ 1×10­²
2. Excellent adhesion with aggregate with no gap Excellent adhesion
3. High strength Marshall stability 250kg-500kg
4. Easy construction Flowcl 20~40(1/100§¯)
5. Bright color Light brown , red color
6. Highly effective in reducing load of drainage Revival and recovery of environment
7. Excellent performance of water-storage under heavy rain Store rain water temporarily
8. Outstanding durability and stability in combination with special additive Application: side walk, walking road, parking lot, playground, exhibition, road for taking a walk, park, palace, leisure facility. Entrance of garden etc
9. Good feeling in walking (feel like tramping the mud)
10. Reduce prevent slip and dazzling
¡ØHigh-temperature unit : 25kg bag(repair of penetration asphalt and concrete, or construction of the road where dump trucks are not allowed to enter.)

Category Penetration asphalt (Tusphalt)

Color penetration concrete(Tu.Com)

Small-sized high pressured block(I.L.P)
Thickness of surface of pavement T : 5§¯ T : 7§¯ Sand : 4§¯
I.L.P(T : 6~8§¯)
Cost of material 864,658 916,391 774,452
Labor cost 210,764 315,405 525,046
Machinery 81,862 17,551  
Net construction cost 1,157,384 1,249,347 1,299,498
Other expenses 236,616 282,653 365,502
V.A.T 139,400 153,200 166,500
Total of construction 1,533,400 1,685,200 1,831,500

Category Permeating asphalt (Tusphalt) Color permeated concrete (Tu.Com) Small-sized high pressured block(I.L.P)
Strength ¤ýPermeating pavement
¤ýProtect ecosystem underground
¤ýNo decolorization
¤ýReduce the load of drainage under rain
¤ýLevel road surface
¤ýNice feels in walking
¤ýPrevent splashing
¤ýPrevent dazzling
¤ýApplicable for small-scaled construction
¤ýPermeating pavement
¤ýProtect ecosystem underground
¤ýNice feels in walking
¤ýLevel road surface
¤ýDiverse color to choose
¤ýEasy to recover excavation
¤ýEasy to repair
¤ýEasy for small-scaled construction
¤ýEasy to supply material
Weakness ¤ýRestrictive application for small-scaled construction (10a) ¤ýRestrictive application forsmall-scaled construction
¤ýSerious decolorization
¤ýRestrictive in construction where excavation is recovered
¤ýProcess of line
¤ýOccurrence of serious frequent
¤ýOccurrence of unevenness frequent
¤ýOccurrence of sinking frequent
¤ýSplashing


 

 


TEL. +82-2-2665-6491~5  
   FAX. +82-2-2665-6494